Standards
Design standards depict current design and construction practices by the Department of Public Utilities for capital improvement and developer construction projects.
Public Utilities Engineering Division
Attention Customers: In an effort to return to our typical meter reading schedule of every 28 to 32 days, some customers will be billed with an estimated meter reading.
Estimated Meter Reading InformationDesign standards depict current design and construction practices by the Department of Public Utilities for capital improvement and developer construction projects.
Public Utilities Engineering Division
The purpose of the Design Standards Manual is to provide conformity in the design and engineering review of public water and wastewater utility improvements, that are owned and maintained by the City of Virginia Beach, Department of Public Utilities.
To assist with designing pump stations to conform with the City's standards, a prototype drawing is available for reference purposes.
Lateral CCTV inspections are performed as part of the acceptance process for developer-installed gravity sewer infrastructure that will be contributed to the City. A copy of the policy is available to view.
Details that are applicable to a specific project are to be inserted into construction drawing sets and shall not be altered in any way. Redrawn details will not be acceptable.