Capital Recovery Fees

Capital recovery fees are applicable to single-family dwellings, duplexes, triplexes, multiple-family dwellings, non-residential uses and mixed-use buildings**.

Single-family Dwellings, Duplexes, Triplexes and Commercial/Non-residential Buildings

Water Meter Size

Water Capital Recovery Fee

Sewer Capital Recovery Fee* (City Installed)

Sewer Capital Recovery Fee (Developer Installed)

Water Meter Size

5/8"

Water Capital Recovery Fee

$2,900

Sewer Capital Recovery Fee* (City Installed)

$2,521

Sewer Capital Recovery Fee (Developer Installed)

$631

Water Meter Size

1"

Water Capital Recovery Fee

$7,251

Sewer Capital Recovery Fee* (City Installed)

$6,302

Sewer Capital Recovery Fee (Developer Installed)

$1,576

Water Meter Size

1.5"

Water Capital Recovery Fee

$14,502

Sewer Capital Recovery Fee* (City Installed)

$12,603

Sewer Capital Recovery Fee (Developer Installed)

$3,151

Water Meter Size

2"

Water Capital Recovery Fee

$23,203

Sewer Capital Recovery Fee* (City Installed)

$20,165

Sewer Capital Recovery Fee (Developer Installed)

$5,042

Water Meter Size

3"

Water Capital Recovery Fee

$43,506

Sewer Capital Recovery Fee* (City Installed)

$37,809

Sewer Capital Recovery Fee (Developer Installed)

$9,453

Water Meter Size

4"

Water Capital Recovery Fee

$72,509

Sewer Capital Recovery Fee* (City Installed)

$63,016

Sewer Capital Recovery Fee (Developer Installed)

$15,754

Water Meter Size

6"

Water Capital Recovery Fee

$145,019

Sewer Capital Recovery Fee* (City Installed)

$126,032

Sewer Capital Recovery Fee (Developer Installed)

$31,508

Water Meter Size

8"

Water Capital Recovery Fee

$232,030

Sewer Capital Recovery Fee* (City Installed)

$201,650

Sewer Capital Recovery Fee (Developer Installed)

$50,413

Water Meter Size

10"

Water Capital Recovery Fee

$333,543

Sewer Capital Recovery Fee* (City Installed)

$289,872

Sewer Capital Recovery Fee (Developer Installed)

$72,468

Multi-family Dwelling with a Master Meter

Units

Water Capital Recovery Fee

Sewer Capital Recovery Fee* (City Installed)

Sewer Capital Recovery Fee (Developer Installed)

Units

Per Unit

Water Capital Recovery Fee

$2,030

Sewer Capital Recovery Fee* (City Installed)

$1,765

Sewer Capital Recovery Fee (Developer Installed)

$442

In certain instances, a percentage of the applicable capital recovery fees shall apply:

  • Sanitary sewer gravity service unavailable: 50% sewer fee only
  • Year-round campgrounds: 100%
  • Seasonal campgrounds: ​50%

* For a property connected to public sewer, but not to the public water system, the appropriate fee shall be assessed according to the water meter size that would be necessary to serve the property.

** Mixed-use buildings with residential and non-residential components are required to be metered separately. Fees are assessed for each meter and service according to the use associated with the meter.

Crediting of Previously Paid Connection Fees

Where a property is redeveloped, connection fees will be credited for existing water and sewer connections.

In the case that the water meter size is increased from what previously existed, the difference in the water and sewer capital recovery fees shall be due.

In the case where the water meter size is decreased from what previously existed, the credited fees shall be applied to any newly assessed fees and no refund will be issued for a surplus in credit.